ALIGN CHALLENGE 2021

Rapid surface development

"After several iterations, the design is pretty close to being concluded. Some minutes before the delivery you have been commissioned to polish a particular area on the front bumper. All the modellers who tried previously did not succeed. The expectations are very high and the design-team needs to deliver the data in less than one hour. Be fast, creative and proactive."

Brief

With just the given information/data and using your modelling/design sensitivity, we expect from you to update the surfaces on the wire file to the new design shown in the image.

Evaluables

We do expect from you the closest outcome possible to the given image, with highest quality surfaces possible.

Time-frame

60 minutes.

Delivery Files

Once the time-frame is finished, please send back the CAD-file to your contact person via email. Thanks and good luck!

*It will open a window to a .ZIP file which content all needed information to proceed with this challenge.

What’s life at ALIGN like? Can’t submit your application? Want to collaborate on another level? Get the answers now.

What’s life at ALIGN like? Can’t submit your application? Want to collaborate on another level? Get the answers now.

Research

Material-technology research

Concept ideation

Surface treatments and finishing

Advance volumetric research

Reverse engineering

Visual Design

Sketch and digital concept

3D Sketch modelling – C Class

Mock-ups and model making

Parametric design

Component design and modelling

Interior and exterior car modelling

Design x manufacturing

Surface development – B Class

Surface production – A Class

Design – engineering iteration

Advance CAD development

As you may already know, all websites use cookies.